Window AC Installation (2 AC)
Installation for 2 Window AC units in one visit. Suitable for any tonnage mix. Includes mounting, leveling, gap sealing, drainage setup and cooling test. Civil work and new wiring are extra.
- Earliest Appointment: Today or next business day
- Easy Reschedule: Free up to 2 hours before slot
About the service
Our Window AC Installation for 2 AC units is meant for customers who need two Window ACs installed in one scheduled visit. You can install any tonnage mix like 0.75 + 1 ton, 1 + 1.5 ton, 1.5 + 2 ton, or two same-ton units.
We handle complete Window AC fitting for both units. This includes checking window frames, safe mounting, correct tilt for drainage, sealing gaps to prevent cooling loss, and final cooling and safety testing. Booking a 2-AC installation saves time, reduces repeated technician visits, and ensures both ACs are installed to the same quality standard.
Best for:
-
Two bedrooms or bedroom plus hall
-
Home plus office room setup
-
Shops or clinics with two cooling zones
-
Re-installation of two Window ACs after renovation
Our process
1. Room and window assessment for both ACs
The technician checks both rooms and window openings. They confirm that each window frame is suitable for the AC weight and tonnage, and suggest the best placement for proper airflow.
2. Frame preparation and support checks
Each frame is inspected for strength and level. Loose panels are tightened. Packing or minor support is added where required so both units sit firm and do not vibrate.
3. Mounting and leveling AC 1 and AC 2
Both Window ACs are mounted one by one. The technician sets a slight outward tilt for correct water drainage and checks leveling carefully so compressors and fans run smoothly.
4. Sealing gaps for both units
All side and top gaps around both ACs are sealed using foam or filler panels. This prevents cooling leakage, hot air entry, dust and insects, which directly impact cooling performance and power consumption.
5. Electrical connection and load safety
Both units are connected to proper rated sockets or stabilizers. The technician checks plug rating, wiring condition, earthing, and MCB load to ensure you can safely run both ACs without tripping or overheating risk.
6. Final test run and handover
Each AC is tested in cooling mode. The technician checks airflow, temperature drop, noise, vibration, and drainage for both units. You get a short demo on settings and maintenance basics.
What we need from you
-
Two ready window openings or frames
-
Working power sockets or stabilizers near both AC locations
-
Ladder or stool if any window is high
-
Both AC units unpacked with remotes and accessories
-
Clear access around both window areas
Our service promise
-
Trained technicians for safe multi-unit installation
-
Proper tilt, sealing, and vibration control on both ACs
-
Electrical load and safety checks included
-
Transparent pricing. Extra materials or wiring quoted before use
-
One visit completes both installations efficiently
Frequently asked questions
Q1. Can I install two different tonnage Window ACs in this service
Yes. This service supports any mix of Window AC tonnages as long as both units are installed at the same address.
Q2. Does this include making new window openings
No. Civil work, wall cutting, or major carpentry is not included. The window openings must be ready.
Q3. Is stabilizer installation included
If you already have stabilizers, the technician can connect them during installation. Buying stabilizers or new wiring work is extra.
Q4. What if one window is weak or unsafe
The technician will inform you. Installation will not be forced on an unsafe frame. You may need to strengthen or modify the frame first.
Q5. How long does 2 AC installation take
Typically 1.5 to 2.5 hours depending on tonnage, height, and window condition.
Be the first to review “Window AC Installation (2 AC)”
Booking and Dispatch
- Appointments are offered for your area in {{territory_name}}.
- You will get a confirmed time window after technician assignment.
- Technician selection uses skills required for the service.
Arrival Window
- Standard arrival window is 60 to 90 minutes around your slot.
- Delays due to weather or traffic are communicated by SMS or call.
Reschedule or Cancel
- Free reschedule or cancel up to {{free_reschedule_window_hours}} hours before the slot.
- Inside the window or technician en route. a visit fee of ₹{{visit_fee}} applies.
Access and Safety
- Ensure power, water and safe access to indoor and outdoor units.
- Provide building permissions if needed. jobs needing special access equipment may be rebooked.
Pricing and Payments
- Fixed price services show the total for the stated scope. parts that are not included are extra.
- Time and Material services charge visit plus actual time and parts. an estimate is shared for approval if parts exceed ₹{{approval_threshold}}.
- Online and UPI and cards accepted on completion.
Service Warranty
- Workmanship warranty is {{warranty_days}} days from completion.
- If the same issue reappears within warranty. we re-visit at no charge and fix our workmanship.
Parts and Materials
- OEM parts carry the manufacturer warranty. labor to fit parts follows our workmanship warranty.
- Refrigerant and consumables are billed as used for T and M jobs.
Refunds
- Prepaid fixed jobs. full refund if canceled before the free window.
- If the technician is dispatched or work has started. the visit fee is deducted.
- No refunds after successful completion of the booked scope.
What is not covered
- Damage due to voltage fluctuation without stabilizer. water ingress. pest or physical abuse.
- Civil works. painting. concealed piping. false ceiling work. unless listed in the service.
- Drain choke caused by building plumbing beyond AC drain.
- Leaks from coils or piping that require replacement. unless you approve the paid repair.








Reviews
There are no reviews yet.