Verified Technicians
Transparent Pricing
Service Warranty
Product on sale

Floor Standing AC Installation (3 AC)

Price range: ₹4,499 through ₹7,499

Installation of 3 floor standing AC units (1.5–5+ ton). Includes AC placement, copper piping, insulation, wiring setup, drainage installation, outdoor unit mounting, pressure testing & cooling performance checks. Extra materials and gas filling are chargeable.

  • Check Mark Earliest Appointment: Today or next business day
  • Check Mark Easy Reschedule: Free up to 2 hours before slot
  • Visa Card
  • MasterCard
  • American Express
  • Discover Card
  • PayPal
  • Apple Pay
Guaranteed Safe And Secure Checkout

About the Service

Our Floor Standing AC Installation Service for 3 Units is built for large commercial environments such as showrooms, offices, malls, restaurants, gyms, studios, banquet halls, warehouses, and any large spaces that require multiple high-capacity tower ACs installed in a single appointment.

Floor standing ACs are heavy-duty commercial machines with large compressors, high electrical load, long piping requirements and complex airflow planning. Installing three tower AC units together requires precise coordination, accurate measurements, and commercial-grade technical expertise.

This service ensures a safe, efficient, and fully standardized installation of 3 tower ACs in one visit, following all brand and safety guidelines.


Ideal For
  • Setting up 3 tower ACs in newly designed commercial spaces

  • Replacing old cooling systems with multiple high-capacity units

  • Cooling large halls, open office floors, gyms & restaurants

  • Shifting 3 AC units to a new location

  • New business setups requiring strong cooling output


Our Process
1. Pre-Installation Site Survey for All 3 AC Units

We inspect the entire area to determine the perfect placement for all three units:

  • Cooling load calculation

  • Individual & combined air throw direction

  • Floor spacing and stability

  • Power load distribution for all 3 units

  • Copper piping route planning

  • Drainage points

  • Outdoor unit space management

  • Tonnage analysis (1.5 ton to 5+ ton each)

Ensures equal cooling performance and long-term safety.


2. Placement & Alignment of 3 Floor Standing Units
  • Units placed at strategic points for uniform cooling

  • Proper spacing between units

  • Ensuring vibration-free and level alignment

  • Optimized airflow without obstruction

  • Professional layout planning for high traffic commercial areas


3. Copper Pipe & Insulation Setup for All Units

For each AC unit:

  • Copper piping connected between indoor & outdoor units

  • Thermal insulation applied

  • Strong and leak-proof flare joints

  • Organized and clean pipe routing

  • Additional copper, drain pipe, or bracket requirements explained transparently


4. Electrical Wiring & Power Load Safety

All three AC units require accurate electrical configuration:

  • Load balancing for 3 heavy-duty machines

  • MCB & wiring compatibility check

  • Secure terminal connections

  • Voltage & ampere testing for each unit

  • Earthing verification

  • Overload protection recommendations

Commercial installations require stable power distribution — we ensure all 3 units operate safely.


5. Individual Drain Line Setup for Each Tower AC
  • Separate or combined drain lines based on layout

  • Proper slope for uninterrupted water flow

  • Leak-proof joints

  • Checking for backflow or blockage possibilities

Prevents water accumulation and leakage issues.


6. Outdoor Unit Placement / Mounting for 3 ODUs

We install and position three outdoor units:

  • Proper airflow clearance around each ODU

  • Vibration-absorbing base support

  • Weather safety considerations

  • Height-based installation (if required)

  • Secure mounting and connection

Ensures maximum cooling output and long compressor life.


7. Pressure Testing, Vacuuming & Gas Check

For all 3 AC units:

  • Line pressure test

  • Vacuuming for moisture removal

  • Checking gas levels

  • Advising if gas top-up is required

  • Ensuring correct refrigerant flow


8. Final Cooling Performance Test (3 AC Units)

We run performance tests on each installed unit:

  • Temperature drop check

  • Airflow & throw test

  • Coil performance

  • Noise & vibration check

  • Drain flow test

  • Operational stability check

All 3 ACs must pass the quality test before handing over.


What We Need From You
  • Suitable space for 3 floor standing AC units

  • Adequate outdoor space for 3 ODUs

  • Access to electrical point

  • Drainage access

  • Information about any previous AC setup

  • Clear pathway for moving heavy tower units


Our Service Promise
  • Installation of 3 tower AC units in a single visit

  • Experienced commercial AC technicians

  • Brand-standard installation

  • Leak-proof piping & secure wiring

  • Clean and organized work

  • Transparent material & labor charges


Frequently asked questions

Q1. Do you install 3 floor standing ACs in the same visit?
Yes, we install all 3 units during one appointment.

Q2. Are all brands supported?
Yes, including Daikin, Blue Star, LG, Carrier, Voltas, Panasonic, Hitachi, Lloyd, Mitsubishi & more.

Q3. Is gas filling included?
No. Gas filling is optional and chargeable separately.

Q4. What if extra copper pipe is needed?
Extra materials are chargeable — technicians inform you beforehand.

Q5. How long does installing 3 AC units take?
Approximately 3–5 hours, depending on pipe routing and site complexity.

Reviews

There are no reviews yet.

Be the first to review “Floor Standing AC Installation (3 AC)”

Your email address will not be published. Required fields are marked *

Booking and Dispatch
  • Appointments are offered for your area in {{territory_name}}.
  • You will get a confirmed time window after technician assignment.
  • Technician selection uses skills required for the service.

Arrival Window
  • Standard arrival window is 60 to 90 minutes around your slot.
  • Delays due to weather or traffic are communicated by SMS or call.

Reschedule or Cancel
  • Free reschedule or cancel up to {{free_reschedule_window_hours}} hours before the slot.
  • Inside the window or technician en route. a visit fee of ₹{{visit_fee}} applies.

Access and Safety
  • Ensure power, water and safe access to indoor and outdoor units.
  • Provide building permissions if needed. jobs needing special access equipment may be rebooked.

Pricing and Payments
  • Fixed price services show the total for the stated scope. parts that are not included are extra.
  • Time and Material services charge visit plus actual time and parts. an estimate is shared for approval if parts exceed ₹{{approval_threshold}}.
  • Online and UPI and cards accepted on completion.

Service Warranty
  • Workmanship warranty is {{warranty_days}} days from completion.
  • If the same issue reappears within warranty. we re-visit at no charge and fix our workmanship.

Parts and Materials
  • OEM parts carry the manufacturer warranty. labor to fit parts follows our workmanship warranty.
  • Refrigerant and consumables are billed as used for T and M jobs.

Refunds
  • Prepaid fixed jobs. full refund if canceled before the free window.
  • If the technician is dispatched or work has started. the visit fee is deducted.
  • No refunds after successful completion of the booked scope.

What is not covered
  • Damage due to voltage fluctuation without stabilizer. water ingress. pest or physical abuse.
  • Civil works. painting. concealed piping. false ceiling work. unless listed in the service.
  • Drain choke caused by building plumbing beyond AC drain.
  • Leaks from coils or piping that require replacement. unless you approve the paid repair.