Verified Technicians
Transparent Pricing
Service Warranty
Product on sale

Floor Standing AC Installation (2 AC)

Original price was: ₹1,899.Current price is: ₹1,799.

Professional installation of 2 floor standing AC units (1.5–5+ ton). Includes positioning, copper piping, insulation, electrical wiring, drainage setup, outdoor unit installation, pressure testing & complete cooling performance check. Extra materials & gas filling charges apply if required.

  • Check Mark Earliest Appointment: Today or next business day
  • Check Mark Easy Reschedule: Free up to 2 hours before slot
  • Visa Card
  • MasterCard
  • American Express
  • Discover Card
  • PayPal
  • Apple Pay
Guaranteed Safe And Secure Checkout
About the Service

Our Floor Standing AC Installation Service for 2 Units is ideal for large commercial spaces such as offices, showrooms, retail stores, restaurants, gyms, salons, warehouses, studios, and banquet halls where two tower ACs need to be installed in a single visit.

Floor standing ACs are heavy-duty cooling systems with high-capacity compressors, specialized electrical load requirements, and long copper piping networks. Installing two tower ACs requires proper planning, technical precision, and safe handling to ensure long-term cooling performance.

This service ensures the safe, efficient, and professional installation of both AC units, following brand guidelines and commercial-grade installation standards.


Ideal For
  • Installing 2 new tower ACs

  • Replacing old commercial AC units

  • Expanding cooling in large halls or showrooms

  • Shifting AC units to a new location

  • Newly renovated or upgraded commercial spaces


Our Process
1. Pre-Installation Site Survey for Both ACs

Technicians inspect the site to plan the placement and installation for two units:

  • Room size and cooling load calculation

  • Ideal placement for uniform airflow

  • Distance from power sources

  • Copper piping path planning

  • Drainage connection availability

  • Outdoor unit accessibility

  • Ton capacity (1.5 to 5+ ton)

Ensures both ACs deliver high cooling efficiency.


2. Positioning of Both Floor Standing Units
  • Units placed in optimal positions

  • Ensuring correct air throw direction

  • Maintaining safety distance from walls

  • Leveling to avoid vibration & noise

  • Space planning so both units operate efficiently together


3. Copper Pipe & Insulation Installation

For both AC units:

  • Copper pipe connection from indoor to outdoor

  • Proper insulation with high-quality material

  • Flare joint leak-proof sealing

  • Organized and aesthetic pipe routing

  • Additional pipe requirement communicated in advance


4. Electrical Wiring & Safety Setup
  • Power load check for both AC units

  • Proper wiring and secure MCB setup

  • Terminal connections tightened

  • Ampere and voltage testing

  • Dedicated circuit verification

  • Earthing and safety compliance

  • Ensures both AC units run safely without overload


5. Drain Line Installation for Both ACs
  • Separate or combined drainage setup

  • Proper slope for water flow

  • Leak-proof drain connections

  • Ensuring drip-free, blockage-free drainage


6. Outdoor Unit Placement / Mounting

For both outdoor units:

  • Safe and stable placement

  • Vibration control pads

  • Proper airflow clearance

  • Weather-safe positioning

  • Height and direction alignment

Outdoor units are tested for noise and performance.


7. Gas Pressure & Line Testing
  • Pressure test for both copper lines

  • Vacuuming if needed

  • Gas level check

  • Gas top-up advice if required

  • Ensuring refrigerant flow is accurate for both units


8. Final Cooling Performance Check

For both ACs individually:

  • Cooling temperature check

  • Air throw & airflow testing

  • Coil & compressor performance

  • Thermostat accuracy check

  • Noise & vibration test

  • Drain flow test

Ensures both tower ACs deliver powerful, uniform cooling.


What We Need From You
  • Space for both floor standing AC units

  • Outdoor installation area for 2 ODU units

  • Electrical line availability

  • Water drainage access

  • Information on previous installation (if any)

  • Clear path for moving heavy units


Our Service Promise
  • Safe installation of 2 floor standing AC units

  • Experienced commercial AC technicians

  • Brand-standard installation practices

  • Leak-proof piping

  • Secure electrical setup

  • Clean and organized work

  • Transparent pricing


Frequently asked questions

Q1. Do you install tower ACs of all brands?
Yes, including Daikin, Blue Star, Voltas, Carrier, LG, Panasonic, Lloyd, Hitachi, Mitsubishi & more.

Q2. Is gas filling included in installation?
No. Gas filling or top-up is a separate service.

Q3. What if extra copper pipe or wiring is needed?
Technicians will inform you before adding any extra materials.

Q4. How long does installing 2 tower ACs take?
Approx. 2–4 hours, depending on site conditions and piping length.

Q5. Can I get installation and uninstallation in the same visit?
Yes, but uninstallation charges are separate.

Reviews

There are no reviews yet.

Be the first to review “Floor Standing AC Installation (2 AC)”

Your email address will not be published. Required fields are marked *

Booking and Dispatch
  • Appointments are offered for your area in {{territory_name}}.
  • You will get a confirmed time window after technician assignment.
  • Technician selection uses skills required for the service.

Arrival Window
  • Standard arrival window is 60 to 90 minutes around your slot.
  • Delays due to weather or traffic are communicated by SMS or call.

Reschedule or Cancel
  • Free reschedule or cancel up to {{free_reschedule_window_hours}} hours before the slot.
  • Inside the window or technician en route. a visit fee of ₹{{visit_fee}} applies.

Access and Safety
  • Ensure power, water and safe access to indoor and outdoor units.
  • Provide building permissions if needed. jobs needing special access equipment may be rebooked.

Pricing and Payments
  • Fixed price services show the total for the stated scope. parts that are not included are extra.
  • Time and Material services charge visit plus actual time and parts. an estimate is shared for approval if parts exceed ₹{{approval_threshold}}.
  • Online and UPI and cards accepted on completion.

Service Warranty
  • Workmanship warranty is {{warranty_days}} days from completion.
  • If the same issue reappears within warranty. we re-visit at no charge and fix our workmanship.

Parts and Materials
  • OEM parts carry the manufacturer warranty. labor to fit parts follows our workmanship warranty.
  • Refrigerant and consumables are billed as used for T and M jobs.

Refunds
  • Prepaid fixed jobs. full refund if canceled before the free window.
  • If the technician is dispatched or work has started. the visit fee is deducted.
  • No refunds after successful completion of the booked scope.

What is not covered
  • Damage due to voltage fluctuation without stabilizer. water ingress. pest or physical abuse.
  • Civil works. painting. concealed piping. false ceiling work. unless listed in the service.
  • Drain choke caused by building plumbing beyond AC drain.
  • Leaks from coils or piping that require replacement. unless you approve the paid repair.